EHV Cables for Power Transmission at National Scale

Extra-high-voltage projects require meticulous design and compliance with strict international standards, since any cable fault can affect a wide service area. Synergy Systems supports projects of this kind in close cooperation with the planning and regulatory bodies, from the cable selection stage through installation and commissioning.

The connection between the Group's cables and high-voltage divisions makes it possible to provide engineering support from initial design through grid connection.

Engineering Design and Supervision for EHV Cable Projects

Extra-high-voltage projects require close engineering supervision throughout all installation stages, including insulation testing and regulatory approvals in accordance with the requirements of the electric utility and the electricity regulator.

מיועד לרמות מתח עליון
Designed for Extra-High-Voltage Levels

A solution for power transmission in large-scale projects.

תכנון לפי תוואי ותנאי קרקע
Design by Route and Ground Conditions

Matched to the length, environment, and installation requirements.

פיקוח הנדסי צמוד
Close Engineering Supervision

Support in cable selection, installation, and testing throughout the project.

עמידה בדרישות חיבור לרשת
Compliance with Grid Connection Requirements

Design in line with the requirements of the operating and regulatory bodies.

קווי חיבור לתחנות כוח
Power Plant Connection Lines

Transmitting power from generation facilities to the transmission grid at extremely high voltage levels.

פרויקטי הולכה ארציים
National Transmission Projects

Cables for strategic routes connecting substations and areas of high power consumption.

שדרוג רשת קיימת
Upgrading an Existing Grid

Replacing cable sections and increasing transmission capacity in live systems.

מתקני תעשייה בקנה מידה גדול
Large-Scale Industrial Facilities

Direct connection of high-power consumers to extra-high-voltage infrastructure.